Glossary | About us | Contact us | Home

Guide to Lead-based Paint Regulations

The following is an outline of federal regulations relating to lead-based paint that affect home sellers, REALTORS®, landlords (and their agents) and anyone classified as a "renovator" in Michigan and elsewhere.

Pre-lease disclosure (September 6, 1996)

Target Housing: Pre-1978 rentals except:

  • Certified "lead-free" property
  • "0-bedroom", elderly, disabled housing
  • Nonrenewable leases <101 days

Requirements:

  • Signed disclosure form before lease commitment. (Specific wording required.)
  • Provide copies of all reports dealing with LBP, even if they say that no LBP is present.
  • OK to provide a certified summary if done by by licensed inspector, but full report must be made available on request.
  • Provide copy of the EPA Pamphlet
  • Retain records for 3 years, subject to unannounced EPA audit.

Pre-renovation (June 1, 1999)

Renovation Defined:

Any work that will disturb 2 square feet of paint in Target Housing or in owner-occupied housing built pre-1978. Includes plumbing, electrical, carpentry, etc.

Requirements:

  • Notify owner, give pamphlet, get signature before work.
  • Notify tenants no more than 60 days before work.
  • Notify again if the nature, location or timing of work changes.
  • Within units: Give pamphlet, get adult signature or certify attempt to deliver.
  • Commons and exteriors: Notify all tenants individually, make pamphlet available.
  • Retain records for 3 years after completion of the project, subject to EPA audit.

Excluded:

Licensed inspector certifies in writing that the paint to be disturbed is not LBP. Emergency repairs. Work done not for compensation, by homeowners, neighbors, volunteers, etc.

Minimizing liability

  • Follow paperwork requirements in all regards, keeping meticulous records.
  • Train maintenance staff in lead-safe practices and in fielding questions from tenants.
  • Have Standard Operating Procedures and abide by them consistently.
  • Owners, keep the property in good condition so that the need for "disturbance" is minimized.
  • Remodelers, make sure your contracts and insurance are up to date. Contracts should define LBP as a hidden condition similar to asbestos or structural damage.

Or, as an alternative to those steps: A lead paint inspection done by a properly licensed and certified inspector who is authorized to issue full or partial exemptions from the regulations. Testing is non-destructive, and takes less than a day on site. Virtually all post-1960 properties will qualify for some form of exemption.

Source: 40 CFR Part 745.